Xiji County 2019 rural road management service facility repair and maintenance project construction bidding announcement
Xiji County 2019 rural road management service facility repair and maintenance project construction bidding announcement
April 26, 2020
"We are like a 'lubricant' Xiji County 2019 rural road management service facility repair and maintenance project construction bidding announcement
1. bidding conditions
this bidding project Xiji County 2019 rural road management service facility repair and maintenance project has been under the management (investment) of Xi'an audit The construction was approved in [2019] No. 218. The owner of the project is Xiji County Highway Administration Bureau. The construction funds come from the 2019 rural highway maintenance project funds of the autonomous region. The project has met the bidding conditions. Now the construction of the project is subject to public bidding
2. Project overview and bidding scope
2.1 construction location: suburb of Xiji County, Shizi, Luozhuang, Xitan, Pingfeng, Sanhe
2.2 construction scale and content: suburban highway station of Xiji County: it is planned to replace the outdoor steps with 51 square meters of marble surface, dismantle the old garden fence and install 19 meters of finished concrete garden fence, dismantle the old courtyard terrace and re harden 412 square meters, and the total thickness of the structural layer is 40 cm, Among them, the surface course is 18 cm thick C25 concrete surface course, the base course is 2 cm thick coarse sand, the cushion is 20 cm thick 3:7 lime soil, the cornice is puttying 48.45 square meters, the outer wall surface is painted with acrylic acid 158.1 square meters, 5 rooms are replaced with indoor wires, 2 sets of solar courtyard lamps are installed, 1 new color steel room is 21 square meters, the indoor floor tiles are replaced 20.25 square meters, the indoor puttying is 299.49 square meters, and the bridge broken aluminum alloy window is replaced 20.25 square meters, Remove the old door and install the anti-theft door of 22.5 square meters, replace the warehouse tile roof with red glazed tile of 40 square meters, remove one old brick house, paint the outer side of the gate fence with acrylic paint of 158.1 square meters, remove some wall caps of 78 meters, discard the remaining 220 square meters, and replace 2 finished door plates; Shizi highway station in Xiji County: it is planned to replace 86.6 square meters of outdoor steps with marble, dismantle the old garden fence and install 108 meters of finished concrete garden fence, dismantle the old hollowed out garden wall outside the gate and build 81.2 meters of solid brick enclosure, dismantle the old courtyard and harden the courtyard with concrete of 60 square meters. The total thickness of the structural layer is 40 cm, of which the surface layer is 18 cm thick C25 concrete surface layer, the base layer is 2 cm thick coarse sand, and the cushion layer is 20 cm thick 3:7 lime soil, Cornice board paint 12 square meters, acrylic paint 323.72 square meters of the outer wall, indoor putty 631.73 square meters, replace 7 rooms with indoor wires, install 2 sets of solar garden lights, replace 18 square meters of broken bridge aluminum alloy windows, remove the old doors and install 15.75 square meters of anti-theft doors, replace 2 sets of automatic roller shutter doors, mineral wool board ceiling 170.98 square meters, replace 140.98 square meters of indoor floor tiles, and transform 150 meters of enclosure walls, Red glazed tile replacement tile roof 551 square meters, face brick paste gate post 14.56 square meters, replace apron 114 square meters, discard the remaining 320 square meters, and replace 2 finished doorplates; Luozhuang highway station in Xiji County: it is planned to replace 30.6 square meters of outdoor steps with marble, dismantle the old garden fence and install 46 meters of 0.6-meter-high concrete finished garden fence, harden 776 square meters of the courtyard, and the total thickness of the structural layer is 40 cm, of which the surface layer is 18 cm thick C25 concrete surface layer, the base layer is 2 cm thick coarse sand, the cushion is 20 cm thick 3:7 lime soil, the cornice board is puttying 27.93 square meters, and the acrylic paint outer wall is 81.13 square meters, Indoor puttying is 254.34 square meters, indoor wires are replaced in 6 rooms, 2 sets of solar garden lights are installed, 21.12 square meters of broken bridge aluminum alloy windows are replaced, the old doors are removed, 16.2 square meters of anti-theft doors are installed, 100.58 square meters of indoor floor tiles are replaced, 56 square meters of warehouse tile roof are replaced with red glazed tiles, 87.9 square meters of exterior wall of warehouse is painted with acrylic acid, 10 meters of toilet wall is repaired, and 30 square meters of rubble retaining wall on the north side of the village is built, Make a apron of 8.72 square meters in the north of the village, a concrete hardened tree garden of 161 square meters, and the total thickness of the structural layer is 36 cm, of which the surface layer is 15 cm C25 concrete surface layer, the base layer is 1 cm thick coarse sand, and the cushion is 20 cm thick 3:7 lime soil. Build 2 new gates and columns, acrylic paint the outer wall of the gate of 72 square meters, rubble masonry the inner side of the gate wall of 72 meters, excavate 20 big trees, harden both sides of the gate of 144 square meters, and putty the inner wall of the gate of 72 square meters, Discard the remaining 386.56 square meters and replace 2 finished doorplates; Xitan highway station in Xiji County: it is planned to replace 74.18 square meters of outdoor steps with marble, dismantle the old garden fence and install 69 meters of 0.6-meter-high concrete finished garden fence, 102 square meters of concrete hardened courtyard, and the total thickness of the structural layer is 40 cm, of which the surface layer is 18 cm thick C25 concrete surface layer, the base layer is 2 cm thick coarse sand, the cushion is 20 cm thick 3:7 lime soil, the cornice board is puttying 20.3 square meters, and the acrylic paint outer wall is 78.3 square meters, Indoor puttying is 416.26 square meters, indoor wires are replaced in 7 rooms, 2 sets of solar garden lights are installed, 18 square meters of bridge broken aluminum alloy windows are replaced, 2 new prefabricated houses are built, the old doors are removed and anti-theft doors are installed in 15.75 square meters, 104.62 square meters of indoor floor tiles are replaced, 108 square meters of acrylic plastered exterior walls are built, 72 meters of brick slope protection are built, 31 meters of enclosure are reconstructed, 1 36 square meters of old warehouse is removed, and 48 meters of water is scattered, Demolish 4.75 square meters of door posts and splayed walls, build 4 meters of new doors and walls, strengthen 27 meters of brick retaining walls, purchase 2 new single sofa, excavate 11 big trees, discard the remaining 375.6 square meters, and replace 2 finished door plates; Pingfeng highway station in Xiji County: it is planned to replace 64.9 square meters of outdoor steps with marble, dismantle the old garden fence and install 55 meters of 0.6-meter-high concrete finished garden fence, 108 square meters of acrylic painted outer wall, 183.14 square meters of indoor putty, replace 3 rooms of indoor wires, install 2 sets of solar courtyard lamps, build a 37.8-square-meter movable board room, 150.6-square-meter acrylic brick painted fence, 3-meter new brick fence, and 31 meters of barbed wire, Roof maintenance is 365.2 square meters, paint door is 11.5 square meters, the remaining 72 square meters are discarded, and 2 finished doorplates are replaced; Sanhe highway station in Xiji County: it is planned to replace the marble with an outdoor terrace of 15 square meters, dismantle the old garden fence and install a 0.6-meter-high concrete finished garden fence of 149 meters, harden the courtyard of 924.73 square meters, and the total thickness of the structural layer is 40 cm, of which the surface layer is 18 cm C25 concrete surface layer, the base layer is 2 cm thick coarse sand, the cushion is 20 cm thick 3:7 lime soil, the acrylic paint office external wall surface is 82.29 square meters, and the indoor putty is 227.99 square meters, Replace 3 rooms with indoor wires, install 2 sets of solar courtyard lights, replace 11.56 square meters of broken bridge aluminum alloy windows, remove the old doors and install 7.29 square meters of anti-theft doors, remove the old doors and install 1 set of automatic rolling shutter doors, replace 51.17 square meters of indoor floor tiles, build 2 new portable houses, replace 175 square meters of tile roofs with red glazed tiles, hang 100.63 square meters of mineral wool board, transform 87.1 meters of enclosure walls, build 1 new gate, and discard 632.12 square meters of surplus, Replace 2 finished doorplates
2.3 bid section division: this bidding project is divided into 1 bid section coating
2.4 bidding scope: all contents within the scope of construction drawings and bill of quantities
3. Qualification requirements for bidders
3.1 this bidding requires bidders to have the qualification of independent legal person, have the qualification of general contracting of housing construction engineering at or above level 3 (including level 3), and have the corresponding construction ability in terms of personnel, equipment, funds, etc., among which, The project manager proposed by the bidder must hold the professional qualification of registered constructor of grade 2 or above (including grade 2) in housing construction engineering (foreign enterprises need to provide Grade 1 Constructor Certificate and registration certificate), have a valid safety production assessment certificate, and do not serve as the project manager of other construction projects under construction (the proposed constructor is the same as that at the on-site bid opening at the time of registration)
3.2 consortium bidding is not accepted in this bidding
3.3 units that have interests with the applicant and may affect the fairness of the bidding shall not participate in the bidding. If the person in charge of the unit is the same person or different units with holding and management relationship, they shall not participate in the bidding at the same time in this bidding project
3.4 each applicant shall log in the "Chinese judgment document" for brittle materials, such as gray cast iron, and print and affix the official seal of the unit
3.5 according to the relevant provisions of Ning Jian (Zhao) Fa [2017] No. 9 document, those who are listed as dishonest Executees by the people's court through the inquiry of "credit China" station shall be restricted from participating in bidding, tendering and bid evaluation activities
3.6 the post qualification method is adopted for the qualification examination of bidders in this bidding
3.7 this project is an electronic standard
4. Time and place of bid registration
4.1 bidders must register their bids through the Ningxia Hui Autonomous Region public resources transaction () from April 26, 2020 to April 30, 2020 (as of 18:00 on April 30, 2020)
4.2 method of obtaining bidding documents: after successful registration, download the bidding documents according to the system prompt from April 26, 2020 to April 30, 2020
4.3 the deadline for submitting bidding documents (bidding deadline, the same below) is 09:00 on May 18, 2020
4.4 the transaction management platform system implements CA lock authentication and secure login management. For CA lock business, please go to the hall on the fourth floor of Ningxia Hui Autonomous Region public resources transaction Administration Bureau (block B, UBS wealth center, No. 49 Beijing Middle Road, Yinchuan City) to consult and handle with Western Security Certification Center Co., Ltd. contact: press key 1. For the use and operation of the new platform, please contact Jiangsu Guotai Xindian Software Co., Ltd., contact:
4.5 before bid opening, all bidders should pay attention to the "change announcement" column, the "clarification and modification" column in the system and the "check and answer reply" column in the system of public resource transactions in Ningxia Hui Autonomous Region in time, and check the adjustment of time or content in time. The tenderee and the agency will not notify in other ways
5. Instructions for bid opening without meeting
at present, it is a critical period for the prevention and control of new-type coronal pneumonia. In order to do a good job in the epidemic prevention and control of public resource transactions in Ningxia, and further promote the integrated development of "Internet +" public resource transactions, during the epidemic prevention and control period, this bidding adopts the system of bid opening without meeting in the bid opening hall, and all potential bidders do not need to attend the bid opening activities on site. Now, the relevant precautions for the operation of the non meeting bid opening system are notified as follows:
5.1 login method: all bidders use IE browser (above IE9 version) to open the login page of the non meeting bid opening hall system in Ningxia. (login address:
5.2 system environment configuration: in order to ensure the normal bidding activities, please configure the system according to the operation manual one day in advance. If there is a problem, click the "environment repair" button in the upper right corner of the login interface of the system in the bid opening hall, Download the environment repair software, and repair it. (see the operation manual for details)
5.3 time of opening the label by the bidder: all bidders who log in to Ningxia do not meet the bid opening hall system need to sign in within 1 hour before the bid opening time. When the bid opening time is up, they can't sign in again, and the units who don't sign in can't participate in this bidding activity
5.4 decryption of bid documents: after the deadline for submission of bid documents, the tenderee or its bidding agency will publish the list of bidders in the system, and issue the instruction for decryption of bid documents after verifying the submission of bid security. The bidders will insert CA lock in their respective places within the specified time, enter the password and implement remote decryption by themselves. Each bidder shall decrypt the bid documents in time to avoid affecting the bidding activities. Because the bidder's network and power supply are unstable, the software and hardware are not configured according to the requirements of the operation manual, and the decryption lock is issued